Sign In | Join Free | My fnxradio.com
China Shaanxi Zhongtuo Mine Equipment Co.,Ltd logo
Shaanxi Zhongtuo Mine Equipment Co.,Ltd
Shaanxi Zhongtuo Mine Equipment Co.,Ltd
Active Member

3 Years

Home > Anchor Accessories >

Multi Strands Anchor Heads Wedge Plates Anchor Accessories For 15.7mm PC Strand

Shaanxi Zhongtuo Mine Equipment Co.,Ltd
Contact Now

Multi Strands Anchor Heads Wedge Plates Anchor Accessories For 15.7mm PC Strand

Brand Name : ZHONGTUO

Certification : CE; ISO

Place of Origin : China

MOQ : 1

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Delivery Time : 7-15Days

Automation : Semi-automatic

PC Strand : 1-15holes

Transport Package : Wooden Box

Wedge Form : 2 Chip or 3 Chips

After-sales Service : Tracking Guidance & Service

Warranty : One Year

Condition : New

Contact Now

Multi strands Anchor Heads (Wedge Plates) for 15.7mm PC Strand

Technical parameter of Bridge Tensioning Equipment Prestressed Anchor

1). Type: Single-hole, Multi-hole; Circular, Flat.

2). Parts: Anchor Ring/Plate, Wedge, Base Plate, etc.

3). Have a high anchor efficiency and very good performance.

4). We can manufacture all kinds of anchorage and prestressed equipment according to your requirement and drawings.

Specification of Bridge Tensioning Equipment Prestressed Anchor

Technical data of YJM13 Anchorage
Specification Anchor Head Bearing Plate Duct Spiral Reinforcement Stressing Jack
ΦA B Square Round ΦE(ID) ΦF H ΦG N
C*D ΦC*D
YJM13-1 38 40 80×10 - 35 80 30 6 3 QYC270
YJM13-2 76 42 115×80 120×80 45 120 40 8 3 YDC1100
YJM13-3 83 42 120×80 130×80 50 120 40 10 3 YDC1100
YJM13-4 87 42 130×87 135×85 50 135 50 10 3 YDC1100
YJM13-5 97 42 140×92 140×100 55 140 50 10 4 YDC1100
YJM13-6 107 45 150×97 150×125 60 160 50 12 4 YDC1100
YJM13-7 107 45 150×97 150×125 60 160 50 12 4 YDC1100
YJM13-8 117 45 165×115 165×135 60 170 50 12 4 YDC1500
YJM13-9 127 48 175×125 175×140 70 180 50 12 4 YDC1500
YJM13-10 136 48 180×130 180×150 80 200 50 14 4 YDC2500
YJM13-11 138 50 180×130 180×150 80 200 50 14 4 YDC2500
YJM13-12 143 50 190×140 190×150 80 210 50 14 5 YDC2500
YJM13-13 147 53 190×140 190×150 80 210 50 14 5 YDC2500
YJM13-14 153 53 195×150 200×160 80 220 50 14 5 YDC2500
YJM13-15 157 55 195×150 200×160 90 220 50 14 5 YDC2500
YJM13-16 167 55 210×160 210×185 90 240 60 16 6 YDC2500
YJM13-17 172 58 220×175 235×185 90 240 60 16 6 YDC3500
YJM13-18 176 58 235×175 235×185 90 260 60 16 6 YDC3500
YJM13-19 176 58 235×175 235×185 90 260 60 16 6 YDC3500
YJM13-20 196 60 270×185 260×200 90 270 60 16 6 YDC3500
YJM13-21 196 63 270×185 260×200 90 270 60 16 6 YDC3500
YJM13-22 196 65 270×185 260×200 90 270 60 18 6 YDC3500
YJM13-23 206 65 295×245 275×260 100 280 60 18 6 YDC4000
YJM13-24 206 68 295×245 275×260 100 280 60 18 6 YDC4000
YJM13-25 216 68 300×260 275×290 100 290 60 18 6 YDC4000
Technical data of YJM15 Anchorage
Specification Anchor Head Bearing Plate Duct Spiral Reinforcement Stressing Jack
ΦA B Square Round ΦE
(ID)
ΦF H ΦG N
C×D ΦC×D
YJM15-1 43 46 80×12 80×20 35 80 30 8 4 QYC270
YJM15-2 83 48 130×85 135×80 50 120 40 10 4 YDC6500
YJM15-3 87 48 130×87 135×85 50 120 40 10 4 YDC650
YJM15-4 97 48 140×92 140×100 50 140 50 10 4 YDC1100
YJM15-5 107 48 150×97 150×120 55 150 50 10 4 YDC1100
YJM15-6 122 50 165×115 165×135 70 170 50 12 4 YDC1500
YJM15-7 122 50 175×125 175×135 70 170 50 12 4 YDC1500
YJM15-8 137 53 180×130 180×150 80 190 50 12 4 YDC2500
YJM15-9 147 53 190×140 190×150 80 200 50 12 4 YDC2500
YJM15-10 157 53 195×150 210×160 90 210 60 14 4 YDC2500
YJM15-11 157 55 210×160 210×160 90 210 60 14 4 YDC2500
YJM15-12 167 55 210×160 210×185 90 230 60 14 4 YDC2500
YJM15-13 177 55 220×175 210×185 90 230 60 14 4 YDC3500
YJM15-14 177 58 225×175 235×185 90 240 60 14 4 YDC3500
YJM15-15 187 60 235×175 235×185 90 260 60 16 5 YDC3500
YJM15-16 187 60 240×175 235×185 90 260 60 16 5 YDC3500
YJM15-17 197 63 250×185 265×200 100 280 60 16 5 YDC4000
YJM15-18 197 63 270×185 265×200 100 280 60 16 5 YDC4000
YJM15-19 197 63 270×185 265×200 100 280 60 16 5 YDC4000
YJM15-20 217 68 295×245 285×260 120 290 60 16 5 YDC5000
YJM15-21 217 70 295×245 285×260 120 290 60 16 5 YDC5000
YJM15-22 217 70 295×245 285×260 120 290 60 18 5 YDC5000
YJM15-23 237 73 310×260 320×260 120 320 60 18 5 YDC5000
YJM15-24 237 75 310×260 320×260 120 320 60 18 5 YDC5000
YJM15-25 237 78 310×300 320×300 120 330 70 18 5 YDC6500

Introduction of Bridge Tensioning Equipment Prestressed Anchor

YM15 series Application

Highway bridges, railway bridges, city overpasses, urban light rail, high-rise buildings, water conservancy and hydropower dam, port anchor pier:, foundation reinforcement and anchorage of rock mass slope protection tunnel vault top, prestressed, subway, "big government building projects, wide warehouse room, tower building, heavy lifting, pushing synovial intermittent propulsion, tunnels, large containers and vessels, sleeper, replacement of bridge bearing: Bridge and building reinforcement, reinforcement engineering, antimagnetic and anti-corrosion engineering (fiber anchor), carbon fiber reinforcement, beam construction, external prestressing engineering, stay cable, suspension cable, etc.

Multi Strands Anchor Heads Wedge Plates Anchor Accessories For 15.7mm PC Strand

Application fields of Post-tensioned Prestressed Anchor
Highway bridges, railway bridges, urban interchanges, urban light rails, high-rise buildings, water conservancy and hydropower dams, port terminals, rock mass slope protection anchoring, foundation reinforcement, tunnel mine roof anchor roof, prestressed grid, subway, large buildings, halls, Warehouse workshop, tower building, heavy lifting, sliding film intermittent propulsion, bridge, and tunnel jacking, large containers and ships, sleepers, replacement of bridge supports, bridge and building reinforcement, steel reinforcement works, anti-magnetic and anti-corrosion works (fiber anchors) ), carbon fiber reinforcement, pre-tensioned beam field construction, external prestressing engineering, stay cables, suspension cables, etc.

Multi Strands Anchor Heads Wedge Plates Anchor Accessories For 15.7mm PC Strand

The attention to Pre-stressed steel strand anchorage tensioning
The tensioning of the prestressed steel strand anchorage is carried out in three stages: pre-tensioning, initial tensioning, and intermediate tensioning. Please follow the steps below carefully:
1. The tensioning anchorage of the same bundle of steel strands must be carried out simultaneously at both ends, and the main oil steel of the jack is slowly filled with oil for tensioning, and the reading of the oil meter is the main factor, and the elongation value of the steel strand is checked. The difference between the actual elongation value and the theoretical elongation value is controlled within plus or minus 6%. The difference between the elongation of the steel strands at both ends should not be greater than 5%, and it is strictly forbidden to stretch one end. The steel bundles that are tensioned at one time are controlled by double control. For the steel bundles that are stretched twice, the elongation value should be used for compounding in the first-stage tensioning, and the tensioning force value should be used for the second-stage supplementary tensioning. Elongation values ​​are recorded on time.
2. The box beam is moved and stored. A 900-ton tire-type beam lifter is used to lift and move the box beam to the beam storage area, and the beam storage platform is aligned. The beam storage area adopts double-layer beam storage.
3. Hole grouting. Prestressed pipeline grouting adopts a vacuum-assisted grouting process. Continuous grouting with screw grouting pump, when the concentration of the slurry flowing out of the grouting nozzle is consistent with the concentration in the grouting pump, connect the grouting port of the pipeline, and open the valve of the grouting port for grouting. When the slurry passes through the transparent tube, the valve of the exhaust port of the vacuum pump can be closed. When the consistency of the slurry flowing out of the exhaust pipe is the same as before filling, the exhaust valve can be closed and the slurry can be continuously pressed. After raising the pressure in the pipeline to 0.50-0.60 MPa, apply pressure for 3 minutes and close the grouting valve. The grouting of the same pipeline should be carried out continuously and completed at one time.

Warm tips About Multi strands Anchor
1. The anchors should be kept properly, and there should be no rust, water, and other sundries in use.
2. Apply lubricant on the outer surface of the tool clip and the inner surface of the taper hole of the anchor plate before use, and often remove the debris on the surface of the clip.
3. Safety measures should be taken during tensioning, and no one can stand after the tensioning jack.
4. The anchor system should be used together and cannot be mixed with other systems.


Product Tags:

Multi Strands Anchor Heads

      

Wedge Plates Anchor Accessories

      

15.7mm PC Strand Anchor Heads

      
Wholesale Multi Strands Anchor Heads Wedge Plates Anchor Accessories For 15.7mm PC Strand from china suppliers

Multi Strands Anchor Heads Wedge Plates Anchor Accessories For 15.7mm PC Strand Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shaanxi Zhongtuo Mine Equipment Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)