Sign In | Join Free | My fnxradio.com |
|
Brand Name : ZHONGTUO
Certification : CE; ISO
Place of Origin : China
MOQ : 1
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time : 7-15Days
Automation : Semi-automatic
PC Strand : 1-15holes
Transport Package : Wooden Box
Wedge Form : 2 Chip or 3 Chips
After-sales Service : Tracking Guidance & Service
Warranty : One Year
Condition : New
Multi strands Anchor Heads (Wedge Plates) for 15.7mm PC Strand
Technical parameter of Bridge Tensioning Equipment Prestressed Anchor
1). Type: Single-hole, Multi-hole; Circular, Flat.
2). Parts: Anchor Ring/Plate, Wedge, Base Plate, etc.
3). Have a high anchor efficiency and very good performance.
4). We can manufacture all kinds of anchorage and prestressed equipment according to your requirement and drawings.
Specification of Bridge Tensioning Equipment Prestressed Anchor
Technical data of YJM13 Anchorage | ||||||||||
Specification | Anchor Head | Bearing Plate | Duct | Spiral Reinforcement | Stressing Jack | |||||
ΦA | B | Square | Round | ΦE(ID) | ΦF | H | ΦG | N | ||
C*D | ΦC*D | |||||||||
YJM13-1 | 38 | 40 | 80×10 | - | 35 | 80 | 30 | 6 | 3 | QYC270 |
YJM13-2 | 76 | 42 | 115×80 | 120×80 | 45 | 120 | 40 | 8 | 3 | YDC1100 |
YJM13-3 | 83 | 42 | 120×80 | 130×80 | 50 | 120 | 40 | 10 | 3 | YDC1100 |
YJM13-4 | 87 | 42 | 130×87 | 135×85 | 50 | 135 | 50 | 10 | 3 | YDC1100 |
YJM13-5 | 97 | 42 | 140×92 | 140×100 | 55 | 140 | 50 | 10 | 4 | YDC1100 |
YJM13-6 | 107 | 45 | 150×97 | 150×125 | 60 | 160 | 50 | 12 | 4 | YDC1100 |
YJM13-7 | 107 | 45 | 150×97 | 150×125 | 60 | 160 | 50 | 12 | 4 | YDC1100 |
YJM13-8 | 117 | 45 | 165×115 | 165×135 | 60 | 170 | 50 | 12 | 4 | YDC1500 |
YJM13-9 | 127 | 48 | 175×125 | 175×140 | 70 | 180 | 50 | 12 | 4 | YDC1500 |
YJM13-10 | 136 | 48 | 180×130 | 180×150 | 80 | 200 | 50 | 14 | 4 | YDC2500 |
YJM13-11 | 138 | 50 | 180×130 | 180×150 | 80 | 200 | 50 | 14 | 4 | YDC2500 |
YJM13-12 | 143 | 50 | 190×140 | 190×150 | 80 | 210 | 50 | 14 | 5 | YDC2500 |
YJM13-13 | 147 | 53 | 190×140 | 190×150 | 80 | 210 | 50 | 14 | 5 | YDC2500 |
YJM13-14 | 153 | 53 | 195×150 | 200×160 | 80 | 220 | 50 | 14 | 5 | YDC2500 |
YJM13-15 | 157 | 55 | 195×150 | 200×160 | 90 | 220 | 50 | 14 | 5 | YDC2500 |
YJM13-16 | 167 | 55 | 210×160 | 210×185 | 90 | 240 | 60 | 16 | 6 | YDC2500 |
YJM13-17 | 172 | 58 | 220×175 | 235×185 | 90 | 240 | 60 | 16 | 6 | YDC3500 |
YJM13-18 | 176 | 58 | 235×175 | 235×185 | 90 | 260 | 60 | 16 | 6 | YDC3500 |
YJM13-19 | 176 | 58 | 235×175 | 235×185 | 90 | 260 | 60 | 16 | 6 | YDC3500 |
YJM13-20 | 196 | 60 | 270×185 | 260×200 | 90 | 270 | 60 | 16 | 6 | YDC3500 |
YJM13-21 | 196 | 63 | 270×185 | 260×200 | 90 | 270 | 60 | 16 | 6 | YDC3500 |
YJM13-22 | 196 | 65 | 270×185 | 260×200 | 90 | 270 | 60 | 18 | 6 | YDC3500 |
YJM13-23 | 206 | 65 | 295×245 | 275×260 | 100 | 280 | 60 | 18 | 6 | YDC4000 |
YJM13-24 | 206 | 68 | 295×245 | 275×260 | 100 | 280 | 60 | 18 | 6 | YDC4000 |
YJM13-25 | 216 | 68 | 300×260 | 275×290 | 100 | 290 | 60 | 18 | 6 | YDC4000 |
Technical data of YJM15 Anchorage | ||||||||||
Specification | Anchor Head | Bearing Plate | Duct | Spiral Reinforcement | Stressing Jack | |||||
ΦA | B | Square | Round | ΦE (ID) | ΦF | H | ΦG | N | ||
C×D | ΦC×D | |||||||||
YJM15-1 | 43 | 46 | 80×12 | 80×20 | 35 | 80 | 30 | 8 | 4 | QYC270 |
YJM15-2 | 83 | 48 | 130×85 | 135×80 | 50 | 120 | 40 | 10 | 4 | YDC6500 |
YJM15-3 | 87 | 48 | 130×87 | 135×85 | 50 | 120 | 40 | 10 | 4 | YDC650 |
YJM15-4 | 97 | 48 | 140×92 | 140×100 | 50 | 140 | 50 | 10 | 4 | YDC1100 |
YJM15-5 | 107 | 48 | 150×97 | 150×120 | 55 | 150 | 50 | 10 | 4 | YDC1100 |
YJM15-6 | 122 | 50 | 165×115 | 165×135 | 70 | 170 | 50 | 12 | 4 | YDC1500 |
YJM15-7 | 122 | 50 | 175×125 | 175×135 | 70 | 170 | 50 | 12 | 4 | YDC1500 |
YJM15-8 | 137 | 53 | 180×130 | 180×150 | 80 | 190 | 50 | 12 | 4 | YDC2500 |
YJM15-9 | 147 | 53 | 190×140 | 190×150 | 80 | 200 | 50 | 12 | 4 | YDC2500 |
YJM15-10 | 157 | 53 | 195×150 | 210×160 | 90 | 210 | 60 | 14 | 4 | YDC2500 |
YJM15-11 | 157 | 55 | 210×160 | 210×160 | 90 | 210 | 60 | 14 | 4 | YDC2500 |
YJM15-12 | 167 | 55 | 210×160 | 210×185 | 90 | 230 | 60 | 14 | 4 | YDC2500 |
YJM15-13 | 177 | 55 | 220×175 | 210×185 | 90 | 230 | 60 | 14 | 4 | YDC3500 |
YJM15-14 | 177 | 58 | 225×175 | 235×185 | 90 | 240 | 60 | 14 | 4 | YDC3500 |
YJM15-15 | 187 | 60 | 235×175 | 235×185 | 90 | 260 | 60 | 16 | 5 | YDC3500 |
YJM15-16 | 187 | 60 | 240×175 | 235×185 | 90 | 260 | 60 | 16 | 5 | YDC3500 |
YJM15-17 | 197 | 63 | 250×185 | 265×200 | 100 | 280 | 60 | 16 | 5 | YDC4000 |
YJM15-18 | 197 | 63 | 270×185 | 265×200 | 100 | 280 | 60 | 16 | 5 | YDC4000 |
YJM15-19 | 197 | 63 | 270×185 | 265×200 | 100 | 280 | 60 | 16 | 5 | YDC4000 |
YJM15-20 | 217 | 68 | 295×245 | 285×260 | 120 | 290 | 60 | 16 | 5 | YDC5000 |
YJM15-21 | 217 | 70 | 295×245 | 285×260 | 120 | 290 | 60 | 16 | 5 | YDC5000 |
YJM15-22 | 217 | 70 | 295×245 | 285×260 | 120 | 290 | 60 | 18 | 5 | YDC5000 |
YJM15-23 | 237 | 73 | 310×260 | 320×260 | 120 | 320 | 60 | 18 | 5 | YDC5000 |
YJM15-24 | 237 | 75 | 310×260 | 320×260 | 120 | 320 | 60 | 18 | 5 | YDC5000 |
YJM15-25 | 237 | 78 | 310×300 | 320×300 | 120 | 330 | 70 | 18 | 5 | YDC6500 |
Introduction of Bridge Tensioning Equipment Prestressed Anchor
YM15 series Application
Highway bridges, railway bridges, city overpasses, urban light rail, high-rise buildings, water conservancy and hydropower dam, port anchor pier:, foundation reinforcement and anchorage of rock mass slope protection tunnel vault top, prestressed, subway, "big government building projects, wide warehouse room, tower building, heavy lifting, pushing synovial intermittent propulsion, tunnels, large containers and vessels, sleeper, replacement of bridge bearing: Bridge and building reinforcement, reinforcement engineering, antimagnetic and anti-corrosion engineering (fiber anchor), carbon fiber reinforcement, beam construction, external prestressing engineering, stay cable, suspension cable, etc.
Application fields of Post-tensioned Prestressed Anchor
Highway bridges, railway bridges, urban interchanges, urban light rails, high-rise buildings, water conservancy and hydropower dams, port terminals, rock mass slope protection anchoring, foundation reinforcement, tunnel mine roof anchor roof, prestressed grid, subway, large buildings, halls, Warehouse workshop, tower building, heavy lifting, sliding film intermittent propulsion, bridge, and tunnel jacking, large containers and ships, sleepers, replacement of bridge supports, bridge and building reinforcement, steel reinforcement works, anti-magnetic and anti-corrosion works (fiber anchors) ), carbon fiber reinforcement, pre-tensioned beam field construction, external prestressing engineering, stay cables, suspension cables, etc.
The attention to Pre-stressed steel strand anchorage tensioning
The tensioning of the prestressed steel strand anchorage is carried out in three stages: pre-tensioning, initial tensioning, and intermediate tensioning. Please follow the steps below carefully:
1. The tensioning anchorage of the same bundle of steel strands must be carried out simultaneously at both ends, and the main oil steel of the jack is slowly filled with oil for tensioning, and the reading of the oil meter is the main factor, and the elongation value of the steel strand is checked. The difference between the actual elongation value and the theoretical elongation value is controlled within plus or minus 6%. The difference between the elongation of the steel strands at both ends should not be greater than 5%, and it is strictly forbidden to stretch one end. The steel bundles that are tensioned at one time are controlled by double control. For the steel bundles that are stretched twice, the elongation value should be used for compounding in the first-stage tensioning, and the tensioning force value should be used for the second-stage supplementary tensioning. Elongation values are recorded on time.
2. The box beam is moved and stored. A 900-ton tire-type beam lifter is used to lift and move the box beam to the beam storage area, and the beam storage platform is aligned. The beam storage area adopts double-layer beam storage.
3. Hole grouting. Prestressed pipeline grouting adopts a vacuum-assisted grouting process. Continuous grouting with screw grouting pump, when the concentration of the slurry flowing out of the grouting nozzle is consistent with the concentration in the grouting pump, connect the grouting port of the pipeline, and open the valve of the grouting port for grouting. When the slurry passes through the transparent tube, the valve of the exhaust port of the vacuum pump can be closed. When the consistency of the slurry flowing out of the exhaust pipe is the same as before filling, the exhaust valve can be closed and the slurry can be continuously pressed. After raising the pressure in the pipeline to 0.50-0.60 MPa, apply pressure for 3 minutes and close the grouting valve. The grouting of the same pipeline should be carried out continuously and completed at one time.
Warm tips About Multi strands Anchor
1. The anchors should be kept properly, and there should be no rust, water, and other sundries in use.
2. Apply lubricant on the outer surface of the tool clip and the inner surface of the taper hole of the anchor plate before use, and often remove the debris on the surface of the clip.
3. Safety measures should be taken during tensioning, and no one can stand after the tensioning jack.
4. The anchor system should be used together and cannot be mixed with other systems.
![]() |
Multi Strands Anchor Heads Wedge Plates Anchor Accessories For 15.7mm PC Strand Images |